My new friends over at Blitzkrieg Motorsports have completed the final steps in order to get the car logbooked. The halo bars have been tied directly to the main hoop with tube gussets. An additional seatbelt tab was welded on each side. Plus I had the A pillar tied into the cage with two long plates. This brings the cage up to spec. The metal head fire extinguishers will be shipped tomorrow from Safe Drives and I’ll be measuring for the length of the tow hooks I’ll need this weekend.
